Hi All
Currently have an Exch55 org that spans two NT4 domains. We now have a
brand new pristine W2K3 domain that has been deployed with 2-way trusts
between them all.

Our plan is to use ADMT to migrate all the a/cs from the two NT4 domains to
new AD forest (ie inter org migrations) but to migrate the Exch55 mbx, we are
looking at introducing an E2K3 into existing Exch5.5 site.

Can this be done, as we're not planning an inplace a/c upgrade but inplace
for Exch5.5 to E2K3?

Many thanks

Ms Moc